Clients First Name
*
Clients Phone
*
Clients Meter Box Photos & Old System Photos (upload multiple at once)
Electricity Bill
Video Of Site (Upload Here)
Notes From Sales Guy
Job Specifics?
RCD Replacements - Needs RCD replacements only? (Select one switchboard option)
Switchboard Upgrade - Needs full upgrade? (Select one switchboard option)
Switchboard Relocation + Upgrade - Needs relocation AND upgrade? (Select one switchboard option)
Phase Conversion - Phase conversion required? (2-Phase to Single-Phase)
Underground Cabling - UG cabling required? (CONFIRM: Customer will dig trench?)
Smart Hot Water Control + Contactor - Automating hot water to solar?
Generator Integration Switch - Wants a generator plug-in point?
Dual Inverter Configuration - Needs two separate inverters?
High-Pitch Safety Access - Roof steep (requiring safety gear)?
Tile Roof Interface Kit - Tile roof requiring kit?
System Over 19kW - Total system size above 19kW?
Existing Panel Removal - Old system to remove?
Panel Optimisation (Tigo) - Tigo optimisers required?
Cyclone-rated Roof Screws Under Panels - Needs cyclone-rated screws?
Multi-Array Layout - Layout across 4 or more roof faces?
Precision Panel Layout - Roof space tight (precision layout)?
EV Charging Station - Needs a car charger?
Battery Included - Battery included in job?
Battery Safety Backing - Battery needs backing (combustible wall)?
Solid Base For Battery - Battery needs solid base (pavers)?
Bollard Needed - Is there a bollard needed for the battery?
Battery Sub Board - Does the job require a battery sub board?
Sun Awning - Does the inverter/battery require a sun awning?
Steep Driveway/Dificult Access - Is the driveway steep or is access to roof difficult?
Remote Installation - Site > 1.5 hours from Shed?
Does the customer need to have work completed before install?
Does the roof need to be replaced by customer first?